VISIT OUR BLOG TO READ ABOUT THIS Modern Country Farm House PROJECT
The building site
The building site
Day 1 of construction
Day 1 of construction
AA Contracting Clears the sod from the building site, being careful not to disturb the marker stakes places by the surveyor. The top soil is saved for future use.
Day 1 of Construction
Modern Country Farm House Project
Day 1 of Construction
Day 2
Day 2
Septic Tanks dropped off.
Day 2
The septic field is dug
Day 2
Day 3
Day 3
Septic field filled with drainage sand.
Day 3
Test holes dug reveal clay. The Geo tech engineer requires the clay be removed and replaced with drainage material. An unfortunate and expensive discovery. The quoted cost of the build instantly increases by $15,000.00
Day 3
Day 3 of Construction
Day 3 of Construction
Modern Country Farm House Project
Day 3
Modern Country Farm House Project
Day 3
Material begins to be dropped off to replace the clay.
Material begins to be dropped off to replace the clay.
Day 4 of Construction
Modern Country Farm House Project
Day 4 of Construction
Day 4 of Construction
Day 4 of Construction
Modern Country Farm House Project
Day 4 of Construction
Modern Country Farm House Project
Day 4 of Construction
 : The structural fill is placed into the dig a bucket at a time.  A bob cat then spreads the material.
The structural fill is placed into the dig a bucket at a time. A bob cat then spreads the material.
A Packer follows behind the bob cat ensuring good compaction.
 : A Packer follows behind the bob cat ensuring good compaction.
 : To get the best compaction the material must be wet at all times.
To get the best compaction the material must be wet at all times.
Back to back, dump truck and pup bring pit run material to backfill the site.
 : Back to back, dump truck and pup bring pit run material to backfill the site.
Day 4 of Construction
Day 4 of Construction
Modern Country Farm House Project
Day 4 of Construction
Modern Country Farm House Project
Day 4 of Construction
Day 5.  The structural fill level is finally up to footing height.
Day 5. The structural fill level is finally up to footing height.
Day 5 of Construction
Modern Country Farm House Project
Day 5 of Construction
Day 5 of Construction
Day 5 of Construction
Modern Country Farm House Project
The Septic field is finished too.
 : The Septic field is finished too.
The Farm
The Farm
Modern Country Farm House Project
 : Suite Master
Suite Master
In floor heating
 : In floor heating
 : Framing
Framing
Kitchen
 : Kitchen
 : Greatroom
Greatroom
Greatroom
 : Greatroom
 : Open Foyer
Open Foyer
Ajay's Room
 : Ajay's Room
 : Seth's Room
Seth's Room
Windows installed and roofing finished
 : Windows installed and roofing finished
 : Fire Place prep on main floor
Fire Place prep on main floor
Sky Light.
 : Sky Light.
Utilities and electrical
Utilities and electrical
Electrical
Electrical
Siding and timbers
Siding and timbers
Weintz family in up to their elbows staining cedar shakes.
Weintz family in up to their elbows staining cedar shakes.
Cedar shakes
Cedar shakes
The PINK stuff. Insulation and poly
The PINK stuff. Insulation and poly
Siding and shakes complete
Siding and shakes complete
Goodbye pink, welcome drywall.
Goodbye pink, welcome drywall.
Spraying the ceiling
Spraying the ceiling
Weintz's milk wash the casing for the basement suite and stain them for the main floor.
Weintz's milk wash the casing for the basement suite and stain them for the main floor.
Sub-floor is laid for vinyl flooring application.
Sub-floor is laid for vinyl flooring application.
 : Father and son.
Father and son.
Main floor
Main floor
Main Dining room
Main Dining room
Lighting shadows
Lighting shadows
Basement suite
Basement suite
Basement Suite
Basement Suite
Suite Kitchen
Suite Kitchen
Main Foyer Looking up toward the greatroom
Main Foyer Looking up toward the greatroom
Foyer
Foyer
Main Greatroom
Main Greatroom
Main greatroom
Main greatroom
Main Floor
Main Floor
Main Kitchen
Main Kitchen
Master bedroom
Master bedroom
Ensuite bathroom
Ensuite bathroom
Ensuite shower
Ensuite shower
Ensuite bathroom
Ensuite bathroom
Seth's room
Seth's room
Boys bathroom
Boys bathroom